Section 8: SIGNATURE OF LEGAL ENTITY OFFICER (THIS INDIVIDUALS NAME WILL APPEAR ON ALL DOT PERMITS). NYC DOT authorization is required before installing a canopy over the sidewalk. 10 Richmond Terrace, Room 308 For non-DDC capital projects, the applicant may contact the Permit Office to request release of a CPO hold. 42 Broadway MeetingsRegular coordination meetings allow decision makers to share information and to discuss project difficulties and constraints. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. To this end, NYC DOT has dedicated time and resources to enhance its own systems and coordination efforts. Applications for most permit types can be submitted to the Manhattan Central Permit Office. StatenIsland.Forestry@parks.nyc.gov There is a central Permit Office in Manhattan and borough Permit Offices in each of the other boroughs. City Hall, 3rd Floor Canopy authorizations and permits are required to place a canopy over the sidewalk. Canopies must be well-maintained at all times. 22 Reade Street Fax: (718) 699-7491 Policies; Accessibility; About CT; 55 Water Street, Concourse Level The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. PHONE # (508) 429-6023. Further information is available in Section 2-02 (h) of the Highway Rules. Fax: (718) 993-3077. Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. MAINTAIN 1 - 11 FOOT LANE ON ONE-WAY STREETS AND TWO 11 FOOT LANES ON TWO-WAY STREETS. The permit to maintain the canopy will remain on hold until after the canopy is installed and inspected. For further information, call (212) 839-9435. Canopy placement must be approved by the owner of the property to which the canopy will be attached. The contact information and hours of operation can be found in Appendix C, NYC DOT Contact Information. Any of these holds will prevent a permittee from applying for new permits: New York City Department of Finance (DOF or Finance) hold If a permittee has failed to pay previously issued summonses/Notices of Violation (NOVs) to the New York City Environmental Control Board (ECB), all future permit requests may be placed on hold until the fees associated with the outstanding summonses/NOVs are paid. In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. THIS STIP IS USED WHEN MORE THAN 50% OF THE INTERSECTION HAS BEEN EXCAVATED OR IF WORK CROSSES THE MIDDLE OF THE INTERSECTION. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. SPECIFICATIONS. The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. A street is considered to be protected for five years from the date it was last resurfaced or reconstructed. NYCityMap is the city's web-based interactive mapping application. (5mb). FOR PROJECT COORDINATION PURPOSES, THE PERMITTEE MUST CONTACT THE RESIDENT ENGINEER FOR THE NYCT SECOND AVENUE SUBWAY PROJECT PRIOR TO COMMENCING WORK. WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. Files: DIGITALLY SIGNED PDF FILES. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY. Connecticut Department of Transportation Division of Traffic Engineering Email: DOT.TrafficElectrical@ct.gov. Listed in the table are the most commonly requested Building Operations/Construction Activity Permit types, which may be used when completing an application. Payment of the waiver request fee, as specified in the Highway Rules, Section 2-03, does not guarantee that approval to work during the embargo period will be granted. An explanation and description of "Holds" may be found in Section 3.5 Other Provisions Pertaining to Permits of this chapter. All active permits in the affected area(s) are suspended during the dates and times of the embargo period and no new permits may be approved, unless a waiver for the work is granted by OCMC. Manuals and Standards. A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. FULL WIDTH OF ROADWAY NOT REQUIRED DURING CONCRETE CURING PERIOD. 311 (or 212-NEW-YORK outside the City) The Bureau is comprised of two offices: All work within the street requires a NYC DOT permit to minimize construction impacts. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). 10 Richmond Terrace Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. Check on alternate side parking. Click here for a list of current construction embargoes. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHEAST QUADRANT OF THE INTERSECTION. To request release of a CON hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. In calendar year 2018 NYC DOT processed more than 700,000 construction permits. Tel: (212) 788-6600, New York City Landmarks Preservation Commission (LPC) They are accessible for the few years before September 2015, and for thelettings since September 2015. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. MAINTAIN A 5 FOOT CLEAR PEDESTRIAN WALKWAY IN ROADWAY. 120-55 Queens Boulevard, 2nd floor For questions, Mon-Fri 8:30 AM until 5:00 PM. Third, following installation of the canopy, a final inspection by HIQA is required to confirm compliance with the applicant's submitted plans. ROADWAY MUST BE RESTORED IN KIND. 30-30 Thomson Avenue, 4th Floor SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. This category of permits applies to any repairs, replacements or new sidewalk installations. All materials used for backfill must be free from bricks, blocks, excavated pavement materials and/or organic material or other debris. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. City streets facilitate the movement of pedestrians, transit riders, motorists and cyclists as well as the delivery of goods and services throughout the city. 1 Centre Street, 9th Floor Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. SPECIAL PROCEDURES TO FOLLOW WHEN RESTORING TRENCHES IN RECENTLY PROTECTED RECONSTRUCTED ROADWAYS: 1. APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application. WORK 10 PM TO 6 AM NIGHTLY. The stipulation text on a NYC DOT permit is the official text, with which a permittee must comply. Asingle PDF of the 619 Standard Sheets is available attheOfficial Electronic Standard Specifications and Standard Sheets website. Brooklyn, NY 11215 Attn: Forestry (212) 839-9561/9566 (212) 839-8856, The Bronx WITHIN THIS 15 FEET THE FIRST 8 FEET ADJACENT TO THE CURB IS FOR MATERIALS/EQUIPMENT, THE THE REMAINDER OF THIS 15 FEET IS FOR 5 FOOT CLEAR FOR PEDESTRIANS WITH BARRIERS NO IMPACT ON THE REMAINDER OF THE 47 FEET OF THE REAMINDER OF THE ROADWAY AT ANY TIME._ MEC-07-270. IF CURB LANE BECOMES A TRAVEL LANE THIS STIP DOES NOT APPLY. See the Highway Rules, Section 2-02(l). CONTRACTORS SHALL NOTIFY IN WRITING BY LETTER POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ALL PROPERTY OWNERS ON THE AFFECTED STREET SEGMENT A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE. New York State law (Article 36 of General Business Law and 16 NYCRR Part 753, AKA Industrial Code 53) requires excavators to contact New York 811, via 811, 800-272-4480 or the internet, within 2 to 10 working days before performing any digging or excavation work. Kew Gardens, NY 11424 WORK 10 AM - 7 PM, MONDAY THROUGH FRIDAY. NYC DOT issues permits for two types of vaults: building vaults and transformer vaults. 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. See, Utilize recycled content in paving materials. It also provides cross-references to useful online forms and tools. WORK 8PM TO 5AM SUNDAY TO FRIDAY MORNING. BACKFILL/COMPACT IN 12 INCH LIFTS. In some cases, applications and supporting documentation must be submitted in person, however the majority of permit applications may be submitted online. NYC DOT may revoke or refuse to renew a permit for any of the reasons listed below. MAINTAIN A 5-FOOT CLEAR SIDEWALK WHEN WORKING ON THE ROADWAY AND A 5-FOOT PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY MEETING NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY WHEN WORKING ON THE SIDEWALK. At that point, OCMC executive staff will determine if additional permit stipulations are required. Permittees can use these maps to make informed decisions while planning new projects. LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. PERMITTEE IS REQUIRED TO OBTAIN PLAN APPROVAL FROM DOT/PERMIT MANAGEMENT ENGINEERING REVIEW AT 212-839-9666, NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. PRIOR TO BEGINING ANY WORK, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). Office hours: 8:30 AM to 5:00 PM, From 7:00 AM to 3:30 PM, Monday to Friday, call: (212) 839-9660/61/62 Section 3.5 Other Provisions Pertaining to Permits contains more information on holds. 24 West 61st St., 5th Fl. Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. 165 Cadman Plaza East New York, NY 10004 If applicable, a permit from the Landmarks Preservation Commission (LPC) for the placement of a canopy in ahistoric district or attached to a landmarked building. THE EMBARGO INCLUDES BUILDING OPERATIONS. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. New York 811 then relays digging and excavation requests to its member network of utility companies and underground facility owners, who are required to mark the location of their underground facilities within two working days. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. BQE Central Workshops. The pedestal is monolithically poured with the foundation. ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. Click here for a copy of the Instructions for Permittee Registration Application. The ASHO in each borough releases Capital Project In-House (CPI) holds and Street Arterial Maintenance (SAM) holds. After obtaining HIQA's authorization, the applicant will be referred to the Permit Office in the borough in which the canopy will be located. FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. Click here to download. LMZ (Lower Manhattan Zone) hold This hold signifies that you are working on a street that falls within the Lower Manhattan Zone (south of and including Canal Street). CONTRACTOR MUST NOTIFY THE ALLIANCE FOR DOWNTOWN NEW YORK 120 BROADWAY SUITE 3340 NEW YORK, NEW YORK 10271 212-566-6700, AT LEAST 3 BUSINESS DAYS PRIOR TO STARTING WORK. Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. The second option is available for applicants who do not have the technology to use the above procedure. In-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted to the central Permit Office in Manhattan. Clicking on the "i" button at the top center of the map will change the cursor into an arrow with an "i" next to it. These forms may also be found inAppendix B, Forms. A Full Closure Review (FCR) hold is triggered when a street is closed for 90 days. WORK INCLUDES: CURB/SIDEWALK REPAIR AS NEEDED; ROADWAY MILLING/REPAIR AND RESURFACING; REMOVAL OF CENTER MEDIAN; RESETTING UTILITY OPENING; REMOVAL/REINSTALLATION OF TRAFFIC SIGNALS INCLUDING CONDUIT; INSTALLATION OF PAVEMENT MARKINGS AND PARKING SIGNAGE. Excavators use those markings to help identify underground facility locations in order to promote public safety and to prevent damage to public and private property. (16 NYCRR Part 753), Additional information can be obtained by contacting New York 811 at 800-272-4480, or visiting the New York 811 Website. The location to which the application should be submitted depends on the location and type of construction-related work to be performed: Central Permit Office in ManhattanIn-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted only to the central Permit Office in Manhattan. DOT is committed to making our streets and sidewalks networks accessible to all, particularly aging New Yorkers and persons with disabilities. 280 Broadway, 3rd Floor HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. FULL CURB LANE RESTORATION WOULD BE REQUIRED FOR 8' WIDTH OF CURB LANE AND THE LENGTH OF ALL CUTS PLUS ANY LL14 CUTBACKS. 1/2RES-RESTORE AS PER SKETCH #8 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. PERMITTEE MUST PROTECT DEP GREEN INFRASTRUCTURE DOWNSTREAM OF THE WORK OR WITHIN 5FT OF THE WORK AREA. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. NYC DOT has a separate procedure for obtaining authorization for emergency utility access cover openings so that applicants can expeditiously perform such work. The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. The second permit for canopy maintenance is automatically placed on a. MAXIMUM OF 11 FEET OF ROADWAY MAY REMAIN CLOSED AFTER WORKING HOURS ONLY FOR CONCRTETE CURING. See Chapter 3Permits and Approvals for more information. 80-30 Park Lane Street excavations also adversely affect the condition of the streets, reducing the number of years the pavement would otherwise be expected to remain in good or excellent condition following resurfacing or reconstruction, and increasing repair and life cycle costs for the city. 130 Stuyvesant Place, 6th Fl. With over 185,000 corners, the Pedestrian Ramp Program is a robust program focused on installing and upgrading pedestrian ramps (curb ramps) throughout the five boroughs. Street Opening Permits are required for excavations or other work in a city street that disturbs the street surface. Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. DURING CLOSURE SCA MUST SUPERVISE FLAGERS AT EACH INTERSECTION APPROCHING THE WALKWAY CLOSURE DIRECTING PEDESTRIAN TO OPPOSITE SIDEWALK VIA CROSSWALK. Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. Bronx.Forestry@parks.nyc.gov Questions regarding permit registration or application processes can be directed to any Permit Office. MAINTAIN 2 LANES NORTHBOUND AND 1 LANE SOUTHBOUND FROM 4PM-6PM M-F. This is discussed in greater detail under Section 4.3 Street Restoration Requirements, and in theSections 2-11(e)(15), 2-11(e)(16) and 2-11(f) of the Highway Rules. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. All other inquiries: (718) 222-7207 New York, NY 10038 For questions, Monday to Friday from 8:30 AM until 5:00 PM. MAY ALSO WORK SAT AND SUN 7 AM TO 6 PM, AS WELL AS NIGHTLY 10 PM TO 5 AM. MUST COORDINATE WITH NYPD PRECINCT C.O. Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). The canopy maintenance permit is from the "07" Canopy Permit series; the specific permit type to be applied for depends on the land use to which the canopy is being attached. Click here for a completed. Applicants have two options to acquire an emergency street opening/excavation permit. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. 47-40 21st Street Special Treatment Projects (STP) hold Any permits issued to work in areas that have a special treatment such as Times Square, Madison Square, Herald Square and other pedestrian plaza areas are automatically placed on hold. 3. Appendices to the Street Works Manual provide additional resources, including a list of common permit types and the supporting documentation required for each permit type, reference copies of applications and required forms, contact information for NYC DOT and other agencies and utilities, a list of the stipulations placed on permits under certain conditions and/or at certain locations, and useful internet links by chapter of the Manual. Fax: (212) 860-1359 SECTION 5: DESIGNATED REPRESENTATIVE(S) TO ACCEPT SERVICE OF SUMMONS AT THE APPLICANT'S BUSINESS OFFICE: Enter the names of at least two people who are authorized to accept summonses for his/her corporation and who are located at his/her business address. SECTION 7: AUTHORIZED REPRESENTATIVES TO OBTAIN PERMITS. If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. CNRRES-RESTORE AS PER SKETCH #6 OF DOT'S PROTECTED STREET RESTORAITON REQ'MENTS. WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT TRAFFIC OPERATIONS DIVISION TO OBTAIN THE RESTORATION PLANS FOR THIS ROADWAY INCLUDING COLOR MARKINGS AND ANY OTHER INSTALLATION REQUIRED. FULL CURB TO CURB RESTORATION WILL BE REQUIRED FOR THE ENTIRE LENGTH OF THE WORK. Fax: 212-720-3488, Queens If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. A single PDF of the 619 Standard Sheets is available at the . WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. If the permit has been expired for more than30 days, a new permit application must be submitted. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. Common examples include approval from the New York City Department of Parks and Recreation (Parks) if any street trees or tree pits will be affected by the proposed work; a permit from the New York City Department of Environmental Protection (DEP) if any water or sewer line will be affected; and a Certificate of Appropriateness from the New York City Landmarks Preservation Commission (LPC) if the proposed work is within an Historic District. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR 12"BEYOND FURTHEST CUT TO CURB LINE FOR ALL CUTS AS AGREED TO W ITH THE BOROUGH ASHO'S OFFICE. NYC DOT is working to enhance the coordination of major planned work that impacts the streets with utility companies and other entities that perform street excavations. Atransformer vaultis a subsurface structure or room that houses electrical transformers and appurtenant equipment. 3030 Third Avenue PEU also accepts applications to abandon existing vaults that are no longer in use. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. New York, NY 10038 Office hours: 8:30 AM-3:30 PM. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America. PERMITTEE IS AUTHORIZED TO RESTRICT PARKING IN FRONT OF WRK ZONE & ALONG THE OPPOSITE CURB LN OF WRK ZONE USING NYPD PAPER SIGNS STATING DAY(S) OF WRK. The screen image below displays the "NYC DOT 10 year Capital Plan" projects in green and protected streets in blue. The applicant will also be notified of any corrective action necessary and recourses available. See Section 3.5.1 Holds for more information. Fax: (718) 816-9194 It also outlines principles for coordinating with NYC DOT when proposing excavation work to help make certain that excavation on streets occurs before or in conjunction with city street work, where practicable. Where applicable, an applicant must submit an original Permit Bond to the Permit Office at the time of permit issuance to cover all costs and expenses that may be incurred by the city as a result of the activity for which the permit is issued or for the purpose of otherwise safeguarding the interests of the city. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . Notices of Violation (NOVs)/Summonsesare issued when there is a violation of laws, rules, regulations, specifications, or stipulations. Additional requirements are contained in Sections 2-02 and 2-09 of the Highway Rulesand should be consulted before any work is performed on the street. New York City Department of Transportation ON STIP WAGE02), WORK NORTHBOUND 7AM-4PM M-F AND 9AM-6PM SAT/SUN. Expanding on thesmall sampling of recommended plants listed in previous versions of the Street Design Manual, DOT is now introducing its Plant Finder tool, offering a broadened database of plants that have been successfully used within the public right-of-way. CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN.
Lunar Sabbath Calendar 2022,
Valentino Beanie Baby 1998,
How Long Does It Take To Charge Powerbeats Pro,
Fred Miller Lapd,
Articles N